Work on Monkey Flower West, or Chamise, continues.
trying to brush back some of the hand touchers, and fix/enhance some of the turns, flow, and drainage so it moves better. Hoping for more rain as its starting to get dry, and tread work will have to stop by next week, as this is a pretty sandy section that needs a little more rain.
photos: http://www.panoramio.com/user/7360633/tags/Trail%20Work-CA-Monkey%20Flower%20West%201-2013