Santiago-Peralta Trail
When I worked with Bellfree Contractors we rerouted and repaired the Peralta Trail. (Oak Trail reroute visible in distance)
When I worked with Bellfree Contractors we rerouted and repaired the Peralta Trail. (Oak Trail reroute visible in distance)
When I worked with Bellfree Contractors we rerouted a very steep section with a switchback, and added several drains and outslope to the Grasshopper Trail.
When I worked with Bellfree Contractors we repaired a badly damaged/eroded switchback with a small crib and several stone waterbars rather than grade reversals as we were limited in reroutes, and there is heavy horse traffic here.
This was a SHARE event…
outside link more photos
When I worked with Bellfree Contractors we rerouted and repaired the Toyon trail.
When I worked with Bellfree Contractors we rerouted a falline trail and installed a rolling contour trail that parallels Avenida De Santiago.
When I worked with Bellfree Contractors we rerouted two steep trails, and added several drains and outslope to Anaheim Hills.
outside link
outside link a few more photos